1091 Project: Today In The Lab

We have been so busy with renovation projects that we forgot that today was a scheduled 1091 post. Instead of a long, thoughtful expose on a current conservation topic, Melissa and I will share some images of what is happening in our labs today. Think of it as a glimpse behind the scenes.

Parks Library and Preservation Underground will be back next month with another riveting 1091 post. Thanks as always for reading, and be sure to click over to Parks Library Preservation to see what is happening in their lab today.

Clockwise from upper left: large phase boxes drying under bricks, ledger bindings being rehoused, the lab (everyone’s at lunch!), making four-flap boxes, Lilly Current Lit books getting CoLibri covers.

Bonus pic: Look what showed up in my mailbox! A wonderful, home-made pop-up note to thank me for some consultation I did for someone whose cat damaged some of their papers.

Can I use the word “squeeeee!” in a professional post?

 

2 thoughts on “1091 Project: Today In The Lab”

Comments are closed.