Back in Construction Mode (But Only Briefly)

During the winter break, we're reconfiguring the Circulation and Reference Desks into a single combined library service point.
During the winter break, we’re reconfiguring the Circulation and Reference Desks into a single combined library service point.

With the fall semester now over, we are going back into construction mode to complete five small projects in Perkins and Bostock Libraries. The majority of the projects are expected to be wrapped up by the start of the semester in January 2016.

Here’s a summary of the projects and what you can expect if you visit the library over the winter break.

New Perkins Library Service Desk: On the main level of Perkins Library, the Circulation and Reference Desks are being completely reconfigured into a new single library service point. Demolition of the existing desk area started this week and is expected to take a week or so. A new desk, consultation spaces, shelving area and processing area will be created in the existing space. While the work is going on, library services will be available by the Perkins archway entrance.

Bostock Floor 2: The spaces formerly occupied by Library Development, Communications, the Duke Collaboratory for Classics Computing, and Business Services will be renovated. Temporary walls have already been removed and pre-construction work has been completed. Once finished, the Data and Visualization and Digital Scholarship department heads and staff will relocate to offices in the renovated space. There will also be a meeting room within their combined suite. The DC3 (temporarily located in the 1928 Rubenstein Library tower offices) will return to a new space just down the hall from their former location.

The former home of Data and Visualization Services on the 2nd floor of Perkins Library is being transformed into a dedicated Dissertation Reading and Writing Lab for Duke graduate students.
The former home of Data and Visualization Services on the 2nd floor of Perkins Library is being transformed into a dedicated Dissertation Reading and Writing Lab for Duke graduate students.

Bostock Floors 2/3: The spaces formerly occupied by the Library Administration Office, Business Services, and Library Human Resources will be touched up, painted, and furniture will be returned to those areas. The former office for Library Human Resources will revert to a reservable meeting room for library staff.

Perkins Floor 3: The temporary stack and reading room spaces created for Rubenstein Library staff and services during the renovation will be returned to student/public spaces. The temporary walls have already been removed and some furniture has been returned. The shelves are clear and some shelving is being removed or relocated. Books and other materials will return to the third floor later in Spring 2016.

New Dissertation Reading and Writing Lab, Perkins Floor 2: The former Data/Visualization Lab on the 2nd floor of Perkins will become a new Dissertation Reading and Writing Lab. The space will be emptied, new carpet will be installed, and a number of open carrels and portable storage units will be installed in late January for use by graduate students. This space is expected to open in February or March.

Pardon our progress while we continue to improve your library!